
The Association of Companies “DOTSOFT S.A.-EUR ELEC S.A.” undertook, through the Local Government Development Organization “Amphiktyonies S.A.”, the implementation of the project “INTEGRATED INFORMATION AND LIGHT SIGNAL SYSTEM FOR THE OPTIMIZATION OF TRAFFIC CONTROL AND THE REDUCTION OF THE ENVIRONMENTAL IMPACT FROM TRAFFIC IN THE MUNICIPALITY OF LAMIA”. The aim of the project is to improve the traffic conditions in the city of Lamia.
DOTSOFT and EUR ELEC, having extensive experience in corresponding traffic management and environmental protection projects, have undertaken the installation of a “smart” light signaling system that will be applied to 13 marked nodes. Each node includes traffic lights, traffic regulators, touch devices and audio devices for the blind, pedestrian crossing time calculation units and pedestrian time countdown units.
In addition, an intelligent pedestrian crossing will be installed to warn drivers early after pedestrian detection, using multiple types of light and sound signaling.
Finally, through the sensors of the smart crossing but also with the use of 50 traffic data detectors, 3 stations Bluetooth technology to detect passing vehicles at specific points and a station of atmospheric pollutants, a significant volume will be collected traffic and environmental data.
The above data will be collected on the Central Smart City Platform to monitor the traffic conditions in the city of Lamia, information to commuters and the analysis of the data. Based on the traffic data that will be collected, the design and implementation of new light signaling programs will be done, with a full effect application. At the same time, a remote surveillance system will operate, which will display the marked nodes on a single geographical background and will inform the Municipality in real time.
At the same time, the information of the drivers in real time is foreseen, with a dynamic system consisting of 4 electronic variable message signs and an application for smart devices where the current traffic situation will be displayed and the time of movement in the intervention area will be calculated.
The project is financed by the European Union (Regional Development Fund) through the co-financed Public Investment Program of the Ministry of the Interior and is expected to be completed at the end of 2024.
This text has been translated automatically from the original Greek. In case of any discrepancy or inaccuracy, the original Greek text prevails. The translation is provided for information purposes only.